Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 30 — Mineral Resources · Part 780 · § 780.35

§ 780.35. Disposal of excess spoil.

305 words·~1 min read·/us/cfr/t30/s§ 780.35·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)Each application shall contain descriptions, including appropriate maps and cross section drawings, of the proposed disposal site and design of the spoil disposal structures according to 30 CFR 816.71-816.74. These plans shall describe the geotechnical investigation, design, construction, operation, maintenance, and removal, if appropriate, of the site and structures.
(b)Except for the disposal of excess spoil on pre existing benches, each application shall contain the results of a geotechnical investigation of the proposed disposal site, including the following:
(1)The character of bedrock and any adverse geologic conditions in the disposal area,
(2)A survey identifying all springs, seepage, and ground water flow observed or anticipated during wet periods in the area of the disposal site;
(3)A survey of the potential effects of subsidence of the subsurface strata due to past and future mining operations;
(4)A technical description of the rock materials to be utilized in the construction of those disposal structures containing rock chimney cores or underlain by a rock drainage blanket; and
(5)A stability analysis including, but not limited to, strength parameters, pore pressures and long-term seepage conditions. These data shall be accompanied by a description of all engineering design assumptions and calculations and the alternatives considered in selecting the specific design specifications and methods.
(c)If, under 30 CFR 816.71(d), rock-toe buttresses or key-way cuts are required, the application shall include the following:
(1)The number, location, and depth of borings or test pits which shall be determined with respect to the size of the spoil disposal structure and subsurface conditions; and
(2)Engineering specifications utilized to design the rock-toe buttress or key-way cuts which shall be determined in accordance with paragraph (b)(5) of this section. \[79 FR 76229, Dec. 22, 2014, as amended at 81 FR 93330, Dec. 20, 2016; 82 FR 54949, Nov. 17, 2017\]
Connections69 cite this · traces to 1
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.